Question 1

The following dc portion of a PV schematic (functionally grounded conductor not shown) is submitted to the building official for permit approval. The building official, who also is he AHJ, allow the system to be installed by requiring what NEC-required MINIMUM size equipment grounding conductor at Location A?



Answer: B
Question 2

Which of the following is an NEC requirement regarding access for large-scale PV electric power production facilities? 


Answer: A
Question 3

A PV system installation utilizes micro inverters connected to each module of the array. Each micro inverter has a nominal rated output of 250WV. Single phase. The microinverters are listed so that multiple inverters may be connected in parallel to a single feeder circuit, and each inverter has ancable and connector rated for 30A. What is the MAXIMUM number of inverters that may be wired together on a single 30A feeder circuit? 


Answer: C
Question 4

A homeowner is weighing the PV module options for a roof-mounted solar array. Which is a correct option to present to the homeowner? 


Answer: D
Question 5

A customer has a 200A service with a 200A rated panel and 200A main breaker located on the street side of the house. There is a 100A breaker located at the opposite end of busbar feeding a 125A subpanel in the backyard. The customer would like to place the inverter the backyard and use the 125 subpanel. Which MAXIMUM inverter(s) output circuit current could be installed? 


Answer: C
Page:    1 / 14      
Total 70 Questions | Updated On: Mar 25, 2025
Add To Cart

© Copyrights DumpsCertify 2025. All Rights Reserved

We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the DumpsCertify.