Become Fortinet Certified with updated NSE7_OTS-7.2 exam questions and correct answers
An OT architect has deployed a Layer 2 switch in the OT network at Level 1 the Purdue model-process
control. The purpose of the Layer 2 switch is to segment traffic between PLC1 and PLC2 with two VLANs.
All the traffic between PLC1 and PLC2 must first flow through the Layer 2 switch and then through the
FortiGate device in the Level 2 supervisory control network.
What statement about the traffic between PLC1 and PLC2 is true?
When you create a user or host profile, which three criteria can you use? (Choose three.)
An OT supervisor has configured LDAP and FSSO for the authentication. The goal is that all the users be authenticated against passive authentication first and, if passive authentication is not successful, then users should be challenged with active authentication.
What should the OT supervisor do to achieve this on FortiGate?Refer to the exhibits.
Which statement about some of the generated report elements from FortiAnalyzer is true?
What are two benefits of a Nozomi integration with FortiNAC? (Choose two.)
© Copyrights DumpsCertify 2025. All Rights Reserved
We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the DumpsCertify.