Question 1

At each grinding, buffing, or wire brushing operation on magnesium, other than the rough finishing of casting, dust must be collected by means of suitable hoods or enclosures connected to a: 


Answer: D
Question 2

The maximum quantity of liquefied petroleum gas (LP-gas) in containers stored by a dealer awaiting resale, and are at one location in a building that is not open to the public, is __ lb. water capacity. 


Answer: C
Question 3

The maximum quantity of liquefied petroleum gas (LP-gas) in containers stored by a dealer awaiting resale, and are at one location in a building that is not open to the public, is __ lb. water capacity. 


Answer: C
Question 4

Paint spray booths must have a clearance of ___ in. from unprotected combustible materials. 


Answer: B
Question 5

The maximum quantity of liquefied petroleum gas (LP-gas) in containers stored by a dealer awaiting resale, and are at one location in a building that is not open to the public, is __ lb. water capacity. 


Answer: C
Page:    1 / 18      
Total 88 Questions | Updated On: Mar 26, 2025
Add To Cart

© Copyrights DumpsCertify 2025. All Rights Reserved

We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the DumpsCertify.