Become iSQI Certified with updated CTAL-TTA_2019DACH exam questions and correct answers
Consider the pseudo code provided below:

Given the following tests, what additional test(s) (if any) would be needed in order to achieve 100% statement
coverage, with the minimum number of tests?
Test 1: A = 7, B = 7, Expected output: 7
Test 2: A = 7, B = 5, Expected output: 5
Which TWO of the following statements about Maintainability testing are TRUE?A) It should start as soon as the draft design documents are available for reviewB) An application can be considered maintainable when static analysis and code review defects have beenfixedC) It tests the regression impact of software or environmental changes to an operational systemD) It can be performed during Operational Acceptance Testing by multiple departmentsE) It can be performed during User Acceptance Testing to ensure business processes can be maintained
Which TWO of the following statements about Maintainability testing are TRUE?A) It should start as soon as the draft design documents are available for reviewB) An application can be considered maintainable when static analysis and code review defects have beenfixedC) It tests the regression impact of software or environmental changes to an operational systemD) It can be performed during Operational Acceptance Testing by multiple departmentsE) It can be performed during User Acceptance Testing to ensure business processes can be maintained
How many test cases are required to test a specification that has three conditions using a decision table testing which is not collapsed?
© Copyrights DumpsCertify 2026. All Rights Reserved
We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the DumpsCertify.