Question 1

A network engineer finds an error that says, 'BIOS failed power-on self-test.' When the engineer checks the console, they discover that the Cisco UCS Blade firmware upgrade process stopped at the 'Configuring and testing memory' stage.
Which set of actions resolves the issue?


Answer: B
Question 2

An engineer removes a VMM domain from an endpoint group called “EPG-1”, but the distributed port group
fails to be deleted. Which action resolves the issue?


Answer: C
Question 3

Refer to the exhibit.
6
A network engineer configures OSPF protocol between two Cisco Nexus 7000 Series Switches. The OSPF neighbors fail to synchronize OSPF databases. Which action resolves the issue?


Answer: D
Question 4

A fabric interconnect fails to start, and the console displays the loader prompt. Which two actions resolve the issue? (Choose two.)


Answer: A,B
Question 5

300-615-page127-image44
Refer to the exhibit. During implementation of a Cisco UCS C-Series Server, an engineer receives the status
that is shown in the exhibit. Which action resolves the issue?


Answer: C
Page:    1 / 45      
Total 221 Questions | Updated On: Mar 26, 2025
Add To Cart

© Copyrights DumpsCertify 2025. All Rights Reserved

We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the DumpsCertify.